Muller Factory Extension

Jun 16, 2019

SECTOR
RETAIL
PROJECT
MULLER FACTORY, TELFORD
LOCATION
SHROPSHIRE
VALUE
£3M

Extension to the existing Muller factory in Donnington Wood, Telford. The extension to the existing factory has seen the site double in size and increase the production capacity to 700M yoghurt pots.

McCoy Contractors were contracted to undertake the following works; placement of stone layers, foul, storm and effluent drainage systems, balancing pond and all drainage outfalls off-site. Further works included; storm attenuation tank, foundations, pile caps, fill to retaining structures, floor slabs and a heavily reinforced high bay warehouse slab on piled foundations. Concrete service yards were constructed and drainage channels with services infrastructure to the new and existing factory were completed.

Benefits

• The construction of the high bay warehouse involved large quantities of reinforcing bar with each bar needing to be accurately spaced to form drill zones where holding down bolts could be drilled by the client in the next phase.
• The storm attenuation tank in the existing Muller car park was reconfigured to allow for an entire row of 30 car parking spaces to be retained by the client during the works to ease the on-site congestion.